MA’AN Development Center has completed the construction of three classrooms, a corridor, and a staircase with a total area of 288 square meters at Bardala Secondary Mixed School. The inauguration was attended by a committee of engineers from the Ministry of Education - Tubas Directorate of Education, the executing contracting company, and the project team from the Ma’an Development Center.
This achievement comes as part of the fourth phase of "JOUD IV: The Jordan Valley's Opportunity to Strengthen Development" project, funded by NRO Organization. The project aims to strengthen the resilience of communities in the Jordan Valley, particularly the most vulnerable and marginalized groups, by improving educational services and infrastructure.
An additional floor was constructed in accordance with the standard specifications approved by the Ministry of Education, providing a healthy and suitable educational environment for students and teachers.
The establishment of this additional floor represents a significant and vital step toward improving the quality of educational services in the area. It also contributes to enhancing the dignity and safety of students and teachers, reflecting the commitment of the "JOUD IV" project to sustainable development in the Jordan Valley, fostering community resilience, and improving living conditions for the most disadvantaged groups.